Used 2023 BMW M3 Competition

Stock: FGPR25734VIN: WBS33AY02PFR25734

Stock: FGPR25734 VIN: WBS33AY02PFR25734

Used 2023 BMW M3 Competition

Detailed Pricing
Retail Price:
$88,787
Total Savings:
- $3,310
Sale Price:
$85,477
Dealer Doc Fee:
+ $1,299
Filing Fee:
+ $599
Private Tag Agency Fee:
+ $298
Total Price:
$87,673

Vehicle Highlights

Special

This vehicle has been marked as a special.
Views
228
Overview
FGPR25734
Stock
WBS33AY02PFR25734
VIN
17,207
Miles
Sedan
Body
RWD
Drivetrain
Black Sapphire Metallic
Exterior
Kyalami Orange/Black
Interior
6 Cyl, 3.0L
Engine
Gas
Fuel
8-speed automatic
Transmission
4
Doors
23*
Highway MPG (EPA estimate)
16*
City MPG (EPA estimate)
Description
Summary
Welcome to Fort Myers Genesis. Fort Myers Genesis is committed to 100% customer satisfaction, no exceptions.

Vehicle Details
Experience performance and refinement with this 2023 BMW M3 Competition, a standout example of BMW engineering located in Fort Myers, FL. With only 17,019 miles, this low-mileage BMW M3 Competition delivers thrilling power from its inline 6-cylinder, 3.0L gasoline engine and a driver-focused rear-wheel-drive layout that enhances handling responsiveness and balanced dynamics.

This BMW M3 Competition pairs exhilarating performance with upscale amenities and advanced technology. Key features include Cross-Traffic Alert for safer lane changes and backing maneuvers, Remote Start for climate comfort on demand, and Parking Assistance to simplify tight-space maneuvering. Stay connected on every drive with Apple CarPlay integration, while the Heated Steering Wheel adds comfort during cooler mornings and elevates the cabin experience.

The BMW M3 Competition's athletic stance and precision-tuned suspension communicate its motorsport pedigree, while a refined interior offers supportive seating and intuitive controls designed for both spirited driving and daily use. Premium materials and thoughtful ergonomics make each journey enjoyable, whether navigating city streets or carving through coastal roads near Fort Myers.

Carefully inspected and maintained, this example represents a compelling option for enthusiasts seeking a near-new performance sedan with low mileage and a strong equipment list. Schedule a test drive in Fort Myers to experience the dynamic character and high-level features of this 2023 BMW M3 Competition firsthand.

Equipment
This model offers Android Auto for seamless smartphone integration. This model offers Apple CarPlay for seamless connectivity. See what's behind you with the back up camera on this small car. The BMW M3 is painted with a sleek and sophisticated black color. It has a clean CARFAX vehicle history report. Maintaining a stable interior temperature in this model is easy with the climate control system. It employs advanced tech for collision avoidance, enhancing safety on the road. This vehicle's Cross-Traffic Alert: Safeguarding you from unexpected traffic when reversing. This unit features cruise control for long trips. It has a 6 Cyl, 3.0L high output engine. Enjoy the tried and true gasoline engine in this vehicle. This vehicle features a hands-free Bluetooth phone system. Keep your hands warm all winter with a heated steering wheel in the BMW M3 . The leather seats in this model are a must for buyers looking for comfort, durability, and style. With the adjustable lumbar support in the vehicle your back will love you. You'll never again be lost in a crowded city or a country region with the navigation system on this unit. This 2023 BMW M3 's Parking Assistance makes parkign effortless with automated guidance and precision. Enjoy the incredible handling with the rear wheel drive on this small car. Never get into a cold vehicle again with the remote start feature on this 2023 BMW M3 . Small and nimble this unit scoots through traffic. It offers great fuel mileage and ease of parking.

Packages
Parking Assistance Package: Parking Assistant Plus Driving Assistance Professional Package: Extended Traffic Jam Assistant; Active Driving Assistant Pro Executive Package: Remote Engine Start; BMW Curved Display with HUD; Heated Steering Wheel; Power Tailgate; SensaTec Dashboard Carbon Fiber Trim Black Sapphire Metallic Front Ventilated Seats **Equipment listed is based on original vehicle build and subject to change. Please confirm the accuracy of the included equipment by calling the dealer prior to purchase.**

Additional Information
Call today to schedule a vehicle showing with an experienced Fort Myers Genesis consultant. If you have a quick question about this unit, don't hesitate to call. Now that you found a vehicle you like, let's schedule a time for you to take a pressure free test drive.
Details
Model Overview
The BMW 3-series hits the road with the rear-wheel-drive 330i and M340i, plus their all-wheel-drive counterparts, the 330i xDrive and M340i xDrive. The M340i and M340i xDrive also benefit from M Performance chassis tuning and an M Sport rear differential, which only heightens their capabilities.

Power in the 330i models comes from a revised twin-turbocharged 2.0L inline-four that makes 255 hp at 5,000 rpm and 295 lb-ft of torque from as low down in the rev range as 1,550 rpm. This is an extra 7 horses and 37 lb-ft over its predecessor thanks to some fine-tuning of BMW's TwinPower system--the turbos, the direct injection fuel system and the nifty camshaft and valve timing systems Double-VANOS and VALVETRONIC. BMW claims 5.6 seconds in the sprint from 0 to 60 mph with the 2-wheel-drive variant, while the xDrive shaves three-tenths from that figure. The M340i models, meanwhile, come with a twin-turbocharged 3.0L inline-six that produces 382 hp and 369 lb-ft of torque. According to BMW, it will hit 60 mph in just 4.2 seconds. Both engines are mated exclusively to an 8-speed automatic transmission with paddle shifters and manual mode; no manual transmission available.

The new RWD M3 is powered by a 3L twin turbo 6-cylinder that produces 473 horsepower with the 6-speed manual transmission and 503 horsepower with the 8-speed automatic. The 330 e hybrid draws its power from a 2L turbocharged 4-cylinder mated to an electric motor that delivers 288 horsepower and increases the range to 290 miles.

The 3-series is offered in Sport Line, Luxury, and M Sport trims, which differ largely through subtle exterior design differences. Standard features include 18-inch wheels (19 for M Sports), auto start-stop, dynamic stability control, 14-way power front seats with SensaTec upholstery, fine-wood inlays, a 10-speaker premium sound system, iDrive with an 8.8-inch central screen, dynamic cruise control, a rearview camera, a multifunction steering wheel with Bluetooth hands-free connectivity with audio streaming, plus an automatic three-zone climate control system, ambient lighting and rain-sensing windshield wipers.

Options include remote start, heated seats and steering wheel, wireless charging and WiFi hotspot, a Harman/Kardon surround sound system, and active cruise control. A convenience package brings blind-spot detection and lane departure warning, LED headlights with cornering lights. The premium package includes a head-up display with BMW navigation and more, plus heated seats and steering wheel. A track handling package adds enhanced steering, suspension and tires, plus an M Sport differential to improve control and large M Sport brakes.
Model Strengths
A Variety Of Options
Athletic Driving Feel
Fuel Efficiency
High-tech Options
Long List Of Appearance Packages And Trims
Compact Size And Maneuverability
Practicality And Comfort
Model Changes
The BMW 3-series get a refreshed exterior and a larger touchscreen for 2023 while the M3 carries over with minimal changes.
Model Value
The BMW 3-series is now in its seventh generation, though the high performance M3 carries over from the sixth generation. The entire range still stands out for being athletic, responsive and fun to drive, as well as relatively fuel-efficient. The 3-series represents the quintessential sports sedan, with far better handling and peppier performance than the equivalent front-wheel drive mid-sized car. Sticking with tradition, the BMW 3-series continues to be rear-wheel drive based, which does wonders for the car's weight distribution and handling, allowing the car to drive like a far more athletic vehicle despite its somewhat humble (but still stylish) 4-door shape.
Features
Parking Assistance Package: Parking Assistant Plus
Driving Assistance Professional Package: Extended Traffic Jam Assistant; Active Driving Assistant Pro
Executive Package: Remote Engine Start; BMW Curved Display with HUD; Heated Steering Wheel; Power Tailgate; SensaTec Dashboard
Carbon Fiber Trim
Black Sapphire Metallic
Front Ventilated Seats
Apple CarPlay and Android Auto Compatibility smart device wireless mirroring
ConnectedDrive Services Professional selective service internet access
Integrated navigation system with voice activation
Frontal Collision Warning forward collision mitigation
City Collision Mitigation pedestrian impact prevention
Rear mounted camera
Lane Keeping Assistant with side collision avoidance
Rear Collision Prevention
Head-up display
Brake assist system
Speed Limit Info traffic sign recognition
Evasion Aid evasion assist system
Front Cross-Traffic Alert front cross traffic warning
Surround View w/3D View aerial view camera
Automatic brake hold
Gauge cluster display size: 12.30
Parking Assistant Plus automatic vehicle parking
Front mounted camera
Right side camera
Left side camera
Blind Spot Detection
Directionally adaptive headlights
High Beam Assistant auto high-beam headlights
Immobilizer
Vehicle tracker
Emergency Stop Assistant unresponsive driver assist
Active Cruise Control with Stop & Go
Dynamic Cruise Control cruise control with steering wheel mounted controls
Power trunk
Keyfob remote start
BMW Intelligent Personal Assistant built-in virtual assistant
Comfort Access with hands-free access and push button start
Keyfob window control
Keyfob sunroof/convertible roof control
Push-button
BMW Digital Key smart device-as-key proximity door locks
Proximity cargo area access release
Full gauge cluster screen
Ventilated driver and front passenger seats
Heated steering wheel
Heated driver and front passenger seats
Merino leather front seat upholstery
Driver seat power reclining
lumbar support
seatback side bolster support
cushion tilt
fore/aft control and height adjustable control
Dual-zone front climate control
Rear climate control system with separate controls
Primary monitor touchscreen
Bluetooth wireless audio streaming
First-row sliding and tilting glass sunroof with express open/close activation sunshade
3L I-6 gasoline direct injection
DOHC
Double VANOS variable valve control
TwinPower twin turbo
premium unleaded
engine with 503HP
3L I-6 DOHC
Package
Connected Package Pro
Mechanical
Engine: 3.0L 6-Cylinder TwinPower Turbo
Engine Auto Stop-Start Feature
Rear-Wheel Drive
3.15 Axle Ratio
Engine Oil Cooler
70-Amp/Hr Maintenance-Free Battery w/Run Down Protection
Regenerative Alternator
Gas-Pressurized Shock Absorbers
Front And Rear Anti-Roll Bars
Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
Electric Power-Assist Speed-Sensing Steering
15.6 Gal. Fuel Tank
Dual Stainless Steel Exhaust w/Dark Chrome Tailpipe Finisher
Strut Front Suspension w/Coil Springs
Multi-Link Rear Suspension w/Coil Springs
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
Electro-Mechanical Limited Slip Differential
Exterior
Tires: 275/35R19 Fr & 285/30R20 Rr Performance -inc: Non run-flat
Tire Mobility Kit
Paint w/Badging
Body-Colored Front Bumper
Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
Rocker Panel Extensions
Black Side Windows Trim and Black Front Windshield Trim
Body-Colored Door Handles
Black Power Heated Auto Dimming Side Mirrors w/Power Folding and Turn Signal Indicator
Fixed Rear Window w/Defroster
Light Tinted Glass
Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
Galvanized Steel/Aluminum/Composite Panels
Lip Spoiler
Black Grille
Trunk Rear Cargo Access
Perimeter/Approach Lights
LED Brakelights
Headlights-Automatic Highbeams
Entertainment
16 Speakers
Streaming Audio
Window Grid Diversity Antenna
harman/kardon Surround Sound System
2 LCD Monitors In The Front
Artti Real-Time Traffic Display
Interior
12-Way Driver Seat -inc: Manual Cushion Extension
12-Way Passenger Seat -inc: Manual Cushion Extension
40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
Manual Tilt/Telescoping Steering Column
Front Cupholder
Rear Cupholder
Compass
Interior Lock Disable
Valet Function
Power Fuel Flap Locking Type
Remote Releases -Inc: Proximity Cargo Access
Garage Door Transmitter
Cruise Control w/Steering Wheel Controls
HVAC -inc: Underseat Ducts, Residual Heat Recirculation and Console Ducts
Illuminated Glove Box
Driver Foot Rest
Interior Trim -inc: Aluminum Instrument Panel Insert, Metal-Look Door Panel Insert, Aluminum Console Insert and Metal-Look Interior Accents
Full Cloth Headliner
Leatherette Door Trim Insert
Leather/Metal-Look Gear Shifter Material
Day-Night Auto-Dimming Rearview Mirror
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
Full Floor Console w/Covered Storage and 3 12V DC Power Outlets
Front And Rear Map Lights
Fade-To-Off Interior Lighting
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
Cargo Area Concealed Storage
Cargo Net
Cargo Features -inc: Tire Mobility Kit
Cargo Space Lights
Memory Settings -inc: Driver Seat and Door Mirrors
Integrated Navigation System w/Voice Activation
Tracker System
ConnectedDrive Services
Apple CarPlay & Android Auto Compatibility
Instrument Panel Covered Bin, Driver / Passenger And Rear Door Bins
Delayed Accessory Power
Driver Information Center
Redundant Digital Speedometer
Outside Temp Gauge
BMW TeleServices
BMW Curved Display
Manual Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints
Sliding Front Center Armrest
Perimeter Alarm
Immobilizer
3 12V DC Power Outlets
Air Filtration
Safety
Side Impact Beams
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Blind Spot Detection Blind Spot
Frontal Collision Warning
Tire Specific Low Tire Pressure Warning
Dual Stage Driver And Passenger Front Airbags
Curtain 1st And 2nd Row Airbags
Airbag Occupancy Sensor
Driver And Passenger Knee Airbag
Rear Child Safety Locks
Outboard Front Lap And Shoulder Safety Belts -inc: Rear Center 3 Point and Pretensioners
Similar Vehicles

2025 BMW 2 Series 228 xDrive

Stock: FGPS58407

Quick View

2020 BMW 5 Series 530i

Stock: FG071318A

Quick View

2021 BMW 5 Series 530i

Stock: C14698A

Quick View

2025 BMW X3 30 xDrive

Stock: VFPY88737

Quick View

Dealer FAQs

Can I get financed for an auto loan at Nissan of Cape Coral?

Getting financed with us is fast and fun. Whether you’ve always enjoyed a sterling credit history, are currently working on improving your credit score even more, or this is your first time buying a car, you can count on the friendly experts at Nissan of Cape Coral to make the whole process transparent and easy to understand. To learn more and get the ball rolling on the right loan for your unique financial situation, call (239)491-0600 or apply online now.

What is the financing process like at Nissan of Cape Coral?

Easy and relaxed. Our primary goal is your total satisfaction, so we provide you with as much time and expert insight as you need to properly consider all of your loan options. This commitment to friendly, honest, and fair service is truly a breath of fresh air and ensures that you drive away happy, satisfied, and behind the wheel of the vehicle you've always wanted.

What are the steps in the financing process at Nissan of Cape Coral?

Great question. Securing a competitive loan from Nissan of Cape Coral takes only three easy steps. First up is to either apply online for pre-approval via our quick and convenient online credit application or call (239)491-0600. From here, one of our financing experts will connect with you to go over the details of your loan offers and ensure that you have everything you need to make a smart and informed decision.

After reviewing your proposed loan terms and consulting with our financial advisors and your trusted personal confidants (friends, family members, etc.), there is only one step left: Finalizing the perfect loan for you via a simple and respectful process. By following these three short steps, you can make the most of the best loan experience here in Cape Coral.

What is involved in securing an auto loan in Cape Coral FL?

The answer to this question includes a variety of factors, such as:

  • Your car's purchase price
  • Your trade in and equity position
  • If the vehicle you are purchasing is new or used
  • The length of your existing loan's life
  • Your current credit score
  • How much you are choosing to invest in a down payment

People from all around Cape Coral come to purchase a clean car, truck, or SUV from our used car lot each and every day. Most loans prepared by our team are entirely unique, so the factors that will shape your bank loan will depend on your specific situation, desires, and needs.

Our expert financial professionals are happy to find and present lots of great offers to ensure that you are in complete control and that you are receiving the best deal possible on the loan you need. Our customers make great and informed decisions based on all of their available options thanks to a perfectly transparent process that we take seriously.

Who can I call at Nissan of Cape Coral to get the financing process started?

Any of our amazing specialists will be more than happy to help you get the ball rolling on your dream car. All you have to do is dial (239)491-0600 when you have a few free moments and you'll soon see that getting approved for a car loan at Nissan of Cape Coral is quick, easy, and convenient.

Dealership advertised price is plus tax, tag, title, pre-delivery service fee of $1,299, Private Tag Agency Fee of $298, and Electronic Registration Filing Fee of $599.95. These charges represent costs and profits to the dealer for cleaning, inspecting, reconditioning vehicles, and preparing documents related to the sale.
New vehicle pricing is plus optional dealer-installed options.
Pre-owned vehicle pricing is plus the Nissan of Cape Coral optional Platinum Premier Package of $2,399.98, and optional Certification Fees (if applicable).
All advertised pricing is on in-stock units only and is subject to change without notice. Advertised pricing includes all manufacturers’ discounts and rebates.
All offers are contingent on financing through NMAC, the manufacturer’s captive lender. While every reasonable effort is made to ensure the accuracy of this information, we are not responsible for any errors or omissions. Please verify any information in question with the dealer. Cape Coral Bonus Cash Offer is a conditional trade-in incentive available with the purchase of a new 2026 in-stock vehicle. Actual trade-in value will be based on dealership appraisal and adjusted for vehicle condition, mileage, and market demand. Not all vehicles will qualify for the maximum trade-in bonus. Trade-in bonus is applied toward the purchase price and cannot be redeemed for cash. Negative equity may affect trade-in payoff and final pricing. Cannot be combined with other trade-in offers.
Loyalty Discount applies to customers who have purchased three (3) or more vehicles from Nissan of Cape Coral within the last seven (7) years.
See dealer for complete details..
© 2026 Nissan of Cape Coral